Home >> Zoning
Zoning Board of Appeals Variance Request $ 500.00
Conditional Use Permit
A. In conjunction with regularly scheduled Planning Commission Meeting $300.00
B. Special Planning Commission Meeting scheduled for this Permit $650.00
Site Plan Review * **
A. In conjunction with regularly scheduled Planning Commission Meeting $300.00
B. Special Planning Commission Meeting scheduled for this Review $650.00
Re-zoning request $600.00
Zoning Permit
– Less than 200 sq ft $ 35.00
– More than 200 sq ft $ 75.00
Fees must be paid when the appropriate application is submitted to Leroy Township for consideration
* Site Plan Review is required where a building permit and/or conditional use permit is required for the erection or structural alterations of a building or dwelling, other than a single-family, two-family or manufactured dwelling or accessory structure, in all zoning districts. A site plan review shall also be required when a land division is requested where an easement or new public street is proposed as a means of access to more than two parcels.
**NOTE: If both a site plan review and conditional use permit can be discussed and decided in the same regularly scheduled meeting by the same applicant, the fee will be $500.00. If both a site plan review and conditional use permit can be discussed and decided in the same specially scheduled meeting by the same applicant, the fee is $800.00.